Canadian Copper Inc. (CSE: CCI) has released initial assay results from eleven drill holes along the western margin of its 100%-owned Murray Brook project in New Brunswick's Bathurst Mining Camp, intersecting broad copper-bearing intervals up to 54.55 metres downhole. Headline results include 33.15 metres at 1.14% copper within a wider 54.55-metre interval at 0.80% copper, with several holes returning grades above 1% copper over meaningful widths. The results represent a 50-metre step-out beyond the previously reported deposit boundary, suggesting potential for westward mineralisation extensions. Investors may be watching how these findings feed into the company's ongoing feasibility study.

Key Points

  • Canadian Copper Inc. (CSE: CCI) — 100%-owned Murray Brook project, Bathurst Mining Camp, New Brunswick
  • Eleven drill holes on sections 0W and 25W returned copper-bearing intervals, with five holes exceeding 30 metres downhole at grades above 0.78% copper
  • 2026 program totalled 4,351 metres in 21 holes; complete hole assays for the western sections are expected in February 2027, subject to lab availability
  • Investors may watch for integration of these results into the Murray Brook feasibility study and any decision on additional drilling

Western Step-Out Drilling at Murray Brook Delivers Broad Copper Intervals

The 2026 exploration program drilled 21 holes totalling 4,351 metres at Murray Brook, with the eleven holes reported here targeting sections 0W and 25W, situated 50 metres west of the known deposit boundary. Five holes returned copper-bearing intervals exceeding 30 metres downhole. Standout results include hole MB26-14, which intersected 32.15 metres at 0.78% copper, including a 15.25-metre interval at 1.46% copper and, within that, 3.00 metres at 3.62% copper. Hole MB26-15 returned 32.40 metres at 0.83% copper, including 14.00 metres at 1.54% copper. All reported intervals are downhole lengths; true widths have not yet been determined.

Sulphide Mineralisation Character and Laboratory QA/QC Process

Mineralisation encountered in the western holes occurs as disseminations, bands, and stringers, with massive to semi-massive sulphide zones observed in core. NQ drill core was photographed and split at Canadian Copper's Caribou facilities before shipment to ALS in Moncton, New Brunswick. Sample preparation included crushing, riffle splitting, and pulverising to standard specifications, with gold determined by fire assay and multi-element analysis performed by four-acid digestion and ICP-MS. The company's quality assurance programme included insertion of reference standards, blanks, and duplicates throughout the sample stream. The geological information was reviewed and approved by Dominique Gagné, P.Geo., an independent qualified person under NI 43-101.

Pending Assays and Feasibility Study Integration Remain Key Milestones

Due to extended laboratory turnaround times, the company rushed assays only for mineralised intervals; complete hole assays for the western sections are expected in February 2027, subject to lab availability. Results for holes MB26-17 to MB26-19 on section 50W are not included in this release. The company stated it is evaluating results alongside its ongoing feasibility study and may undertake additional drilling. Any contribution to mineral resources, the mine plan, or project economics will require further geological modelling and technical evaluation, and the geological model remains preliminary at this stage.