First Majestic Silver Corp. (NYSE: AG | TSX: AG) has released a technical report for its Los Gatos Silver Mine in Mexico, formally supporting the mineral resource and mineral reserve estimates previously disclosed for the year ended December 31, 2025. The report carries an effective date of August 25, 2026, and was prepared by five Qualified Persons employed by the company under National Instrument 43-101 standards. The company confirmed the technical report does not disclose any material change to estimates already announced, making it a formalisation of previously reported figures rather than a new resource update.

Key Points

  • First Majestic Silver Corp. (NYSE: AG | TSX: AG | FSE: FMV) released an NI 43-101 technical report for Los Gatos Silver Mine on August 25, 2026.
  • The report supports mineral resource and mineral reserve estimates with an effective date of December 31, 2025, and confirms no material change from figures previously disclosed on March 31, 2026.
  • First Majestic holds a 70% interest in the Los Gatos Joint Venture; Dowa Metals & Mining Co., Ltd. holds the remaining 30%.
  • Investors may be watching whether future drilling or mine design updates result in a material resource revision at Los Gatos.

Los Gatos Technical Report Scope and Qualified Person Sign-Off

The technical report, titled "NI 43-101 Technical Report on Mineral Resource and Mineral Reserve Estimates, Los Gatos Silver Mine," was prepared by Gonzalo Mercado, P.Geo., David Rowe, CPG, AIPG, Andrew Pocock, P.Eng., Hector Mezquita, RM MMSA, and María Elena Vázquez Jaimes, P.Geo., all employed by First Majestic. David Rowe serves as the Qualified Person responsible for mineral resources, while Andrew Pocock holds that role for mineral reserves. The report was filed voluntarily and was not filed in connection with a material change or short-form prospectus, the company stated in its announcement.

Mineral Resource and Reserve Estimates Reported on Dual Ownership Basis

Mineral resource and reserve figures are presented on both a 100% Los Gatos Joint Venture basis and a 70% attributable basis reflecting First Majestic's ownership stake. Resources are classified under CIM Definition Standards and reported within conceptually mineable stope shapes on an in-situ basis, with no mining dilution or recovery factors applied. Reserve estimates use a variable net smelter return cut-off methodology and account for modifying factors including mining methods, dilution, geotechnical conditions, metallurgical performance, and environmental and social considerations. The company cautions that mineral resources that are not mineral reserves do not have demonstrated economic viability.

Los Gatos Joint Venture Structure and First Majestic's Operating Role

Los Gatos is owned through the Los Gatos Joint Venture, in which First Majestic holds a 70% interest and acts as operator. Dowa Metals & Mining Co., Ltd. holds the remaining 30% interest. The mine is one of four producing underground mines in Mexico operated by First Majestic, alongside the Santa Elena, San Dimas, and La Encantada properties. The company also holds development and exploration assets, including the Jerritt Canyon Gold Mine in northeastern Nevada. The immediate share price impact was not clear from available public information.