AbraSilver Resource Corp. (TSX: ABRA | OTCQX: ABBRF) has reported assay results from two diamond drill holes at the Oculto deposit within its wholly-owned Diablillos project in Argentina. Hole DDH-26-064 intersected 75.0 metres grading 2.44 g/t gold and 106 g/t silver in oxides, while hole DDH-26-063A returned 253.0 metres grading 0.54 g/t gold, extending the broad oxide gold zone eastward toward Oculto East. The results, released November 9, 2026, are part of the ongoing Phase VI exploration program and are expected to feed into an updated Mineral Resource estimate.
Key Points
- AbraSilver Resource Corp. (TSX: ABRA | OTCQX: ABBRF)
- DDH-26-064 returned 75.0 m at 2.44 g/t gold and 106 g/t silver within the planned Oculto open pit; DDH-26-063A returned 253.0 m at 0.54 g/t gold extending mineralization toward Oculto East
- Phase VI program on track for year-end completion; updated Mineral Resource estimate expected Q2 2027; final construction decision also targeted for Q2 2027
- Investors may be watching for pending assay results and the forthcoming Heap Leach PEA
High-Grade Infill Results Confirm Oculto Open Pit Continuity
Drill hole DDH-26-064 was completed as an infill hole within the planned Oculto open pit to confirm grade continuity ahead of an updated Mineral Resource estimate. The hole intersected three mineralised zones characteristic of the Oculto deposit: a shallow gold zone, a silver-enriched zone returning 5.0 metres grading 556 g/t silver from 158.0 metres, and a deeper gold zone returning 75.0 metres at 2.44 g/t gold and 106 g/t silver from 220.0 metres. High-grade subintervals include 8.0 metres at 5.94 g/t gold and 7.0 metres at 7.97 g/t gold. Near the base of the hole, 16.5 metres at 1.50 g/t gold and 0.44% copper were intersected in sulphides.
Oculto East Hole Extends Broad Oxide Gold Zone Beyond Current Pit Design
Hole DDH-26-063A, drilled at the eastern margin of the Oculto deposit, intersected 253.0 metres grading 0.54 g/t gold and 10 g/t silver from 116.0 metres, including 4.0 metres at 2.24 g/t gold from 229.0 metres. The release states much of this interval lies below the current open pit design and extends the broad oxide gold zone east of the Cross Breccia toward Oculto East. Combined with hole DDH-26-061, which previously returned 228.0 metres grading 1.79 g/t gold, the two holes together support the potential eastward extension of the gold system beyond the existing pit boundary, with further drilling underway to define continuity.
Phase VI Program Progress and Diablillos Project Milestones
Three diamond drill rigs are currently active at Diablillos, and AbraSilver states the Phase VI exploration program remains on track for completion by year-end. All Phase VI results will be incorporated into an updated Mineral Resource estimate expected in Q2 2027. The company also notes that a detailed CSAMT geophysical survey over the Diablillos system has recently been completed, with results being interpreted to prioritise future drill targets. A Heap Leach Preliminary Economic Assessment and a final construction decision on Phase 1 development are both targeted for Q2 2027, according to the announcement. Additional assay results remain pending.


Please wait processing your request...