Amaroq Ltd. (AIM, NASDAQ Iceland: AMRQ, OTCQX: AMRQF) has published an updated Mineral Resource Estimate (MRE5) for its 100%-owned Nalunaq gold mine in South Greenland, announcing total mineral resources of 504,000 ounces of contained gold at an average grade of 30.35 grams per tonne. The estimate, which supersedes the previous MRE4 released in March 2025, reflects a 10.6% increase in Indicated gold resources to 174,000 ounces, demonstrating resource conversion progress that the company states strengthens the pathway towards declaring a maiden Mineral Reserve. The announcement comes in conjunction with Amaroq's proposed admission to the Official List of the Financial Conduct Authority and trading on the London Stock Exchange's main market.
Key Points
- Amaroq Ltd. (AMRQ) has released MRE5 with an effective date of 1 December 2025, prepared independently by Bara Consulting Ltd.
- Total Mineral Resources increased to 504,000 ounces of contained gold at 30.35g/t Au, comprising 174,000 ounces Indicated and 329,000 ounces Inferred.
- Indicated Mineral Resources grew 10.6% to 174,000 ounces (163,300 tonnes at 33.20g/t Au), more than replacing depletion from mining operations through the estimate date.
- The company incorporated 6,467 metres of new drilling from 41 drillholes plus 284 surface and underground samples collected during 2025, concentrated in the Upper Mountain Block.
- An additional Exploration Target of 400,000–2,200,000 tonnes at 10–30g/t Au has been identified for Main Vein potential but is conceptual and not classified as Mineral Resource.
- Investors should monitor progress on maiden Mineral Reserve declaration and resource conversion drilling targeting the high-grade MB HG2 domain currently classified as Inferred.
Nalunaq Crosses 500,000-Ounce Milestone with Significant Grade Profile
Amaroq's updated Mineral Resource Estimate for Nalunaq has reached a notable threshold, with total contained gold now exceeding 500,000 ounces. The MRE5, which has an effective date of 1 December 2025, consolidates the high-grade character of the South Greenland asset and reflects the company's progression toward a production-ready development stage. The deposit's average grade of 30.35 grams per tonne of gold positions Nalunaq among high-grade gold properties, a characteristic the company emphasises as foundational to its mine development strategy.
The resource base comprises 516,100 dry metric tonnes of material, split between 163,300 tonnes in the Indicated category and 352,800 tonnes in the Inferred category. This composition reflects a balance between higher-confidence resources supported by dense drilling and sampling in key zones and deeper or less-sampled areas where further definition work is planned. The release states that the resource demonstrates resilience to economic assumptions, with Bara Consulting estimating that a doubling of the cut-off grade to approximately 12 grams per tonne would reduce contained gold by only approximately 12%, reflecting the deposit's consistent grade distribution.
Indicated Resources Expand by 10.6 Percent, Demonstrating Resource Conversion Progress
The most substantial change between MRE4 and MRE5 is the 10.6% increase in Indicated Mineral Resources, which grew from 158,000 ounces to 174,000 ounces of contained gold. This expansion is particularly significant because it demonstrates that Amaroq's underground infill drilling and development sampling programmes are not only replacing ounces depleted by mining activities but adding net new resources to the Indicated category. James Gilbertson, Vice President Exploration, noted in his commentary that this increase represents "more significant than the headline growth" and confirms that the company's focused programmes are "progressively increasing confidence in the resource."
The Indicated Resource growth was principally driven by successful 2025 underground drilling and development sampling in the Upper Mountain Block, allowing the Indicated classification boundary to extend further within this key zone. According to the announcement, the Indicated Mineral Resources are now calculated at 163,300 tonnes at a grade of 33.20 grams per tonne of gold. The statement notes that Indicated Mineral Resources are principally supported by areas of high-density underground development sampling and drilling within the first variogram search range, establishing a technical foundation for more confident mine planning and reserve conversion studies.
2025 Drilling and Sampling Programme Drives Resource Definition
The updated estimate incorporates a substantial new dataset collected during the 2025 field season. MRE5 includes drilling from 11 surface diamond drillholes and 30 underground diamond drillholes, totalling 6,467 metres of new drilling. In addition, the company collected 119 underground channel samples and 165 underground chip samples during the year. This focused data acquisition programme was concentrated within the Upper Mountain Block, where increased sample density supported the extension of the Indicated Mineral Resource classification, and in southern areas testing the continuation of the Main Vein within the lower Valley region.
The release indicates that the 2025 data has improved definition of the Main Vein and associated high-grade domains from underground drilling, channel sampling and chip sampling. The resource model continues to treat the deposit within separate high and lower-grade estimation domains to represent the geological distribution and nugget effect characteristic of Nalunaq's coarse-gold mineralisation. The announcement states that the full MRE5 database comprises drilling and sampling information accumulated since initial exploration of Nalunaq in the early 1990s, with domain-based grade estimation, variography analysis, and validation against underground development sampling and surveyed mine workings.
High-Grade MB HG2 Domain Remains a Priority for Resource Definition
A significant portion of Nalunaq's resource base remains classified in the Inferred category, with particular emphasis on the MB HG2 domain, which contains approximately 174,300 ounces at an extraordinarily high grade of 87.89 grams per tonne of gold (61.7 kilotonnes of material). According to the announcement, this domain remains entirely classified as Inferred because of the current density and distribution of drill coverage, despite its exceptional grade profile. Gilbertson stated that this zone "remains a clear priority for further definition drilling," indicating that resource conversion work targeting this area is likely to be a near-term focus for the company.
The assignment of the MB HG2 domain to the Inferred category reflects the rigorous standards applied to resource classification under National Instrument 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards. The announcement makes clear that progressing this material to higher classification categories would require increased drilling density and supporting data. Such conversion could potentially have material implications for future Mineral Reserve declarations and mine planning, as upgrading this high-grade domain to Indicated or Measured status would add significant metal to the higher-confidence resource base.
Cut-Off Grade Revision Reflects Updated Operating Assumptions
The MRE5 is reported above a cut-off grade of 5.52 grams per tonne of gold, a reduction from the 5.90 grams per tonne cut-off applied in MRE4. The release states that the revised cut-off grade reflects updated mining, processing and operating cost information, together with a long-term gold price assumption of US$3,000 per ounce and a 94% combined gravity and flotation recovery assumption. Additional operating assumptions incorporated include a mining cost of US$164 per tonne, processing cost of US$160 per tonne, and allocated general and administrative costs of US$46 per tonne.
The announcement notes that these assumptions were independently reviewed and validated by Bara Consulting Ltd., the independent Qualified Person responsible for the estimate. The lowering of the cut-off grade from MRE4 reflects what the company describes as the transition to an owner-operated mining model and the commissioning of the full gravity and flotation process flowsheet. Bara also undertook Mineable Shape Optimiser work using mining parameters consistent with the cut-off grade assumptions and Amaroq's current operating parameters, confirming that the reported undiluted MRE5 remains well aligned with mining-dilution assessment at practical minimum stoping dimensions.
Exploration Target Identifies Additional Main Vein Potential Beyond Current Resource
Beyond the defined Mineral Resource, Bara Consulting has identified an Exploration Target for further Main Vein potential comprising 400,000 to 2,200,000 tonnes at grades of 10 to 30 grams per tonne of gold. The release emphasises that this Exploration Target is conceptual in nature and is not a Mineral Resource. The target includes areas where geological and assay information indicates potential continuity of the Main Vein, but where data density is currently insufficient to allow classification as a Mineral Resource. The announcement specifically notes that the identified 75 vein extensions to the Main Vein within the South Block Deeps area are not included in this exploration potential.
The disclosure further states that there has been insufficient exploration to define a Mineral Resource from these areas, and it is uncertain whether further exploration will result in all or any part of the Exploration Target being delineated as a Mineral Resource. Gilbertson commented that "the Main Vein also remains open along strike and at depth, with significant conceptual potential beyond the current Mineral Resource," and that the company will "continue systematic underground and surface drilling with the dual objective of progressively replacing mined ounces and expanding the overall resource base." This language suggests ongoing exploration activity targeting additional near-mine gold mineralisation.
MRE5 Excludes Recent High-Grade Drilling Results, Indicating Future Upside Potential
The announcement includes a notable disclosure that MRE5 does not incorporate the most recent high-grade intersections from ongoing underground drilling, which post-date the 1 December 2025 effective date of the estimate. The release states that these recent results "provide clear potential upside for future Mineral Resource updates." This statement suggests that drilling completed after the resource estimate effective date has delivered encouraging results that may contribute to resource growth in subsequent updates, though specific drill intersections and grades are not provided in the announcement.
The exclusion of post-effective-date drilling results from the estimate is consistent with standard industry practice for resource estimation, which fixes an effective date and incorporates only data available as of that date. However, the reference to "clear potential upside" indicates that the company has identified encouraging drill results in its recent underground programmes that have not yet been formally incorporated into the resource model. This provides a structured framework for investors to monitor upcoming resource updates and reserve conversion progress.
Technical Foundation Established for Maiden Mineral Reserve Declaration
A central theme of the announcement is that MRE5 provides a "strengthened technical foundation for ongoing mine planning, resource conversion drilling and the studies required to support the declaration of a maiden Mineral Reserve." No Mineral Reserves have yet been declared for Nalunaq, and the release emphasises that Mineral Resources "do not have demonstrated economic viability." The progression from the current resource estimate to a reserve declaration would require additional technical and economic studies, including mine planning, geotechnical assessment, and economic analysis to demonstrate that the mineralisation can be economically extracted under reasonably foreseeable circumstances.
The announcement notes that the company is undertaking "the studies required to support" reserve declaration, indicating that work toward a maiden reserve is underway or planned. The strong Indicated Resource base, the demonstrated capacity to convert Inferred resources to Indicated through focused drilling, and the identification of high-grade domains suitable for definition drilling provide the technical scaffolding for advancing toward reserve status. Investors may be watching for future announcements regarding mineral reserve estimates, feasibility studies, or other development-stage disclosures.
London Stock Exchange Admission Accompanies Resource Disclosure
The MRE5 announcement is being made in conjunction with Amaroq's proposed admission of its common shares to the Official List of the Financial Conduct Authority and to trading on the main market for listed securities of the London Stock Exchange. This regulatory milestone represents a significant corporate development, as the company transitions from AIM listing and NASDAQ Iceland trading to the primary official list of the London Stock Exchange. The timing of the resource estimate release alongside this admission reflects the importance of current technical and operational disclosures to the capital markets transition.
The company continues to be listed on AIM, NASDAQ Iceland (under ticker AMRQ), and the OTCQX Markets (under ticker AMRQF) as of the announcement date. The proposed London Stock Exchange main market listing represents an expansion of Amaroq's trading venues and a signal to institutional investors of the company's development stage maturity. Resource and reserve estimates such as MRE5 are typically central to the investment narrative for mine development companies, and their publication in conjunction with capital markets events underscores their materiality to the company's equity story.


Please wait processing your request...