Asante Gold Corporation (TSXV: ASE | GSE: ASG | OTCQX: ASGOF) has released full-year 2026 production and cost guidance alongside an operational update covering its Bibiani and Chirano Gold Mines in Ghana. The company targets 275,000 to 300,000 ounces of gold at an All-In Sustaining Cost of US$3,200 to US$3,600 per ounce, with the stronger performance expected in H2 2026 and weighted toward Q4. The announcement follows a strategic operating review by new management and signals a shift from infrastructure buildout toward disciplined operational delivery.
Key Points
- Asante Gold Corporation (TSXV: ASE | GSE: ASG | OTCQX: ASGOF) operates the Bibiani and Chirano Gold Mines on the Sefwi-Bibiani Gold Belt in Ghana
- Full-year 2026 guidance set at 275,000–300,000 ounces of gold at AISC of US$3,200–US$3,600 per ounce
- Approximately US$50 million in previously planned capital expenditure has been deferred or cancelled; exploration budget stands at approximately US$23.4 million for 2026
- H2 2026 performance, weighted to Q4, is expected to be driven by access to higher-grade material at Bibiani's northern Main Pit
Bibiani Mine Transitions to Higher-Grade Northern Main Pit Material
At the Bibiani open pit operation, mining is advancing into the higher-grade northern section of Main Pit, which the company states is expected to drive a progressive increase in plant head grade through the second half of 2026. Substantial investment in processing plant infrastructure over the past 18 months has funded projects targeting throughput and recovery improvements, including replacement secondary electric crushing systems, a pending pebble crusher installation, grinding circuit optimisation, gravity circuit upgrades with additional Knelson concentrators, and a flotation circuit expansion. Additional back-up generators are also being installed to improve power reliability at site.
Chirano Underground and Open Pit Operations Targeting Consistent Ore Delivery
At Chirano, the company reports a stabilised operating platform following investment in underground mining capacity. Reduced reliance on single active mining fronts is expected to support more consistent ore delivery to the processing plant. Several plant upgrade opportunities are under review, including installation of quaternary and gyratory crushers, an elution circuit upgrade, and an additional CIP tank intended to reduce gold in circuit and improve metallurgical recovery. The company states that approved projects will target more predictable gold production and reduced unit operating costs across the combined underground and open pit operations.
Capital Discipline and Mineral Resource Base Underpin Longer-Term Outlook
Asante's new management has deferred or cancelled approximately US$50 million in previously planned capital expenditure since the start of 2026 while continuing to review contractor and supply chain agreements. Measured and Indicated Resources across both operations total 4.6 million ounces effective 31 December 2025, in line with December 2023 levels despite mining over 430,000 ounces across two years. A further 1.8 million ounces of Inferred Mineral Resources provides a near-term conversion pipeline. The company has budgeted approximately US$23.4 million for exploration in 2026, covering near-mine and greenfields drilling programmes.