ATERRA Metals Inc. (CSE: ATC) (OTCQB: CSSCF) has announced the commencement of preparations for a maiden independent Mineral Resource Estimate (MRE) at its Totora Cu/Au Project in Chile's Dos Amigos Mining District. The company has engaged SRK Consulting (Chile) SpA to prepare the NI 43-101-compliant estimate, which will incorporate results from ATERRA's recently completed Phase I drill program alongside historical drilling data. The MRE is anticipated to be available for release during September 2026, marking a significant milestone for the project's development.

Key Points

  • ATERRA Metals Inc. (CSE: ATC / OTCQB: CSSCF) is a copper-gold exploration company focused on the Americas
  • The company has commenced preparation of its maiden NI 43-101 MRE for the Totora Cu/Au Project, engaging SRK Consulting (Chile) SpA
  • The MRE will cover three copper-gold porphyry systems — Frontera, Totora, and Clinton — with release anticipated in September 2026
  • Investors may be watching whether the MRE delivers a resource inventory that supports future economic studies at Totora

Three Porphyry Systems to Be Defined in ATERRA's First Independent Resource Estimate

The maiden MRE will focus on three principal copper-gold porphyry systems on the Totora property: Frontera, Totora, and Clinton, described in the announcement as the most advanced exploration targets on the property. SRK Consulting (Chile) SpA, characterised in the release as a leading international mining consultancy, will prepare the estimate in accordance with NI 43-101 standards. The estimate will integrate results from ATERRA's recently completed Phase I drill program with historical drilling completed on the project, aiming to establish the initial mineral inventory and a technical foundation for future economic studies.

Phase I Drilling Highlights Informing the Totora Resource Calculation

The MRE will draw on Phase I drill results previously disclosed on July 16, 2026. At the Frontera target, hole AFROD01 returned 284 metres grading 0.64% CuEq (0.41% Cu and 0.27 g/t Au) from surface, including 180 metres grading 0.71% CuEq. At the Totora target, hole ATOD01 returned 194 metres grading 0.41% CuEq (0.35% Cu and 0.11 g/t Au) from 254 metres downhole. Copper equivalent grades were estimated using a copper price of US$4.00 per pound and a gold price of US$3,500 per ounce, with assumed recoveries of 85% for both copper and gold.

Strategic Location Within the Dos Amigos Mining District

The Totora project is situated 15 kilometres south of Tintina Mines' Domekyo Sulfuros development project within the Dos Amigos Mining District. ATERRA's announcement highlights what it describes as renewed industry interest in the district, citing recent investments by multiple companies in the region. The release states that Chief Executive Officer Carl Hansen views this increasing activity as underscoring the strategic position of the Totora project within an emerging copper-gold mining district, although no specific third-party transaction details were disclosed in this announcement.