Axion Minerals Corp. (CSE: AXN) has commenced its Phase 1 exploration program at the Cranberry Creek Rare Earth Element (REE) Property, located approximately 23 kilometres south of Revelstoke, British Columbia. The company announced that its field team mobilised to the property on October 10, 2026, with fieldwork expected to take four to five weeks depending on weather and logistics. The program follows up on priority targets identified during the November 2025 exploration season and includes portable backpack drilling to collect shallow subsurface material for geological analysis. Investors may be watching this development as it represents the company's first systematic follow-up campaign at the property.
Key Points
- Axion Minerals Corp. (CSE: AXN) is a British Columbia-based mineral exploration company focused on the Cranberry Creek REE Property in the Kamloops Mining Division.
- Phase 1 exploration has commenced, targeting priority REE anomalies identified from the 2025 program using backpack drilling and geophysical surveys.
- The 2025 program returned total rare earth element (TREE) values ranging from approximately 15 ppm to more than 5,700 ppm across 208 samples; no Mineral Resource or Mineral Reserve has been defined.
- Investors should watch for results from Phase 1 geological mapping, geochemical sampling, and ground radiometric and magnetic surveys as the program concludes.
2025 Sampling Results Drive Phase 1 Follow-Up at Cranberry Creek
The Phase 1 program is grounded in findings from Axion's November 2025 exploration campaign, which included prospecting, geological mapping, airborne and ground geophysical surveys, and the collection of 208 samples — comprising 86 rock, 110 soil, and 12 stream-sediment samples. Rock samples returned TREE values from approximately 15 ppm to more than 5,700 ppm, with localised heavy rare earth element, yttrium, and elevated zirconium responses also noted. The company stresses these are reconnaissance surface-sampling results used solely to guide follow-up work, and they do not confirm subsurface grade, thickness, or continuity of any mineralisation.
Backpack Drilling and Geophysical Surveys Form Core of Phase 1 Activities
Phase 1 activities include detailed geological mapping and prospecting, follow-up rock and infill soil sampling, additional stream-sediment sampling in under-tested drainages of Cranberry Creek and Mulvehill Creek, and ground radiometric surveying. Ground magnetic and VLF-EM surveys may also be completed over selected target corridors. The portable backpack drill will collect shallow subsurface material at a limited number of locations associated with higher 2025 REE values, aiming to help assess the geological setting of surface anomalies. CEO Christopher Hill stated the team is focused on determining the most appropriate next steps for the property, according to the release.
Cranberry Creek Property Overview and Axion's Interest
The Cranberry Creek REE Property comprises three contiguous mineral claims covering approximately 2,673.19 hectares in the Kamloops Mining Division of British Columbia. The property is underlain principally by high-grade metamorphic rocks of the Monashee Complex, including muscovite- and biotite-rich gneiss, quartzite, schist, and local granitic and pegmatitic intrusions. Axion holds an option to acquire a 100% interest in the property. The Phase 1 work program is based on the recommended program outlined in an Independent Technical Report effective June 3, 2026, reviewed and approved by Qualified Person Afzaal Pirzada, P.Geo.




Please wait processing your request...