Cascade Copper Corp. (CSE: CASC) has announced it has exercised its earn-in option to acquire a 100% interest in the Centrefire Copper and Gold Project in northwestern Ontario, completing the third and final option instalment of cash and shares. The 3,922-hectare project sits within the Wabigoon Greenstone Belt, approximately 40 kilometres northeast of Dryden. The milestone gives Cascade full ownership of the asset following a Phase 1 drill program that returned encouraging copper-equivalent intersections, and investors may be watching the company's planned Phase 2 exploration activities closely.
Key Points
- Cascade Copper Corp. (CSE: CASC / FRA: 91O) announced full ownership of its flagship Ontario copper-gold project
- The company exercised its earn-in option, securing 100% of the 3,922-hectare Centrefire Copper-Gold Project in northwest Ontario
- The original vendor retains a 2% NSR on a portion of the project area, with 1% repurchasable for $1 million; Phase 1 drilling returned 1.56% CuEq over 14.75 metres within a broader 0.78% CuEq zone over 52.90 metres
- Investors may monitor the planned Phase 2 drill program and additional surveys including biogeochemistry, LiDAR, and airborne EM
Centrefire Project Area and Historical Exploration Context
The Centrefire Copper-Gold Project covers 3,922 hectares within the Wabigoon Greenstone Belt, situated roughly 35 kilometres southwest of Sioux Lookout. The release states that historical exploration was limited, comprising 10 short drill holes, five surface trenches, channel sampling, and geophysical surveys. Phelps Dodge explored the area between 1968 and 1970, identifying stacked intervals of copper, gold, and nickel mineralisation. Recent work by Cascade has confirmed surface mineralisation and redefined priority drill targets, with surface sampling returning values up to 2.86% copper, 2.84 g/t gold, and 23.5 g/t silver, according to the announcement.
Phase 1 Drill Results That Underpinned the Option Exercise
Cascade's recently completed Phase 1 drill program returned multiple intervals exceeding 1.0% copper equivalent. The company's disclosure highlights drill hole CF-26-04 as a standout result, returning 1.56% CuEq over 14.75 metres within a broader zone grading 0.78% CuEq over 52.90 metres; the entire 122.40-metre hole returned 0.42% CuEq. Copper-equivalent values were calculated using commodity prices of US$5.00 per pound copper, US$3,750 per ounce gold, and US$50 per ounce silver, with respective recovery factors of 85%, 75%, and 65%, as stated in the release. The technical disclosure was approved by Shannon Baird, P.Geo., Vice President Exploration, acting as Qualified Person under National Instrument 43-101.
Phase 2 Programme and Broader Exploration Plans at Centrefire
With 100% ownership secured, the company states it plans a Phase 2 drill program designed to test along-strike and depth continuity of zones intersected during Phase 1, with a focus on the potential deeper, higher-grade core of the system at what the release refers to as the MGZ. Additional surveys including biogeochemistry, LiDAR, and airborne EM are planned to delineate further targets across the project area and within newly staked claims. The immediate share price impact was not clear from available public information.



Please wait processing your request...