Copper One Resources Corp. (CSE: CEXY) has announced the completion of drill hole MHB-42, the fourth hole drilled under its 2026 Phase 2 diamond drilling program at the 100%-owned Majuba Hill Copper-Silver-Gold Project in Pershing County, Nevada. The hole reached a final downhole depth of 1,510 feet (460 metres), with preliminary core logging identifying pervasive silicification, tourmaline breccia at multiple depths, and fracture coatings of hematite and tenorite. No laboratory assay results are being reported at this stage, leaving investors to watch for copper grade data as the program continues.
Key Points
- Copper One Resources Corp. (CSE: CEXY | OTCID: CEXYF | FSE: IW8)
- Drill hole MHB-42 completed to 1,510 feet (460 metres) at Majuba Hill, Nevada — the fourth hole in the 2026 Phase 2 program
- Holes MHB-39 through MHB-42 combined total 6,435 feet (1,961 metres) drilled; program scope is up to 10,000 feet (3,048 metres)
- Investors should watch for laboratory assay results, which will determine copper grades across sampled intervals
MHB-42 Geological Observations Across a 1,510-Foot Downhole Range
MHB-42 was drilled at a grid azimuth of 350° and an inclination of −80°. Preliminary field logging identified pervasive silicification with fine-grained pyrite and chalcopyrite, tourmaline breccia zones at multiple depths, and fracture coatings preliminarily interpreted as hematite and tenorite. Secondary copper mineralisation was also visually observed along a fracture in silicified rhyolite at approximately 798 feet (243 metres) downhole. The company cautions that all mineral identifications are preliminary visual observations and have not been confirmed by laboratory analysis; they do not establish metal grades, continuous mineralised widths, or economic significance.
Phase 2 Program Scope and Real-Time Drilling Technology at Majuba Hill
The expanded Phase 2 program targets up to 10,000 feet (3,048 metres) of HQ/PQ diamond core drilling, with contractor Evolve Exploration Nevada, LLC operating on a continuous two-shift, 24-hours-a-day, seven-days-a-week schedule. Evolve's EVX Connect platform provides Copper One with live drilling metrics, digital Progressive Logs of Drilling, drill-hole coordinate tracking, and high-quality core photographs accessible through web and mobile interfaces. The maximum planned hole depth under the initial scope is approximately 1,850 feet (564 metres), with final collar locations and orientations determined by the company's technical team.
Majuba Hill's Position Within Copper One's North American Portfolio
Majuba Hill is a past-producing copper mine spanning approximately 9,684 acres (3,919 hectares) in Nevada — a jurisdiction that ranked first globally on the Investment Attractiveness Index in the Fraser Institute's 2025 Annual Survey of Mining Companies. More than 95,000 feet (28,956 metres) have been drilled across more than 100 holes to date at the project. The company's objective is to advance Majuba Hill toward an inaugural NI 43-101 mineral resource estimate. Copper One also holds the Redonda Copper-Molybdenum Project in British Columbia and the Redhill Property near Ashcroft, BC, among other North American assets.




Please wait processing your request...