Criterium Energy Ltd. (TSXV: CEQ), a Canadian-based upstream energy company focused on Southeast Asia, announced that total corporate production has tripled to approximately 1,850 barrels of oil equivalent per day following first gas from its SE-MGH field on November 10, 2026. The company simultaneously released unaudited financial results for the third quarter ended September 30, 2026, reporting petroleum sales of C$7,210,000 for the quarter. Management stated that increased cash flow from higher production is expected to support the next phase of gas development and balance sheet improvement.
Key Points
- Criterium Energy Ltd. (TSXV: CEQ) is a Calgary-based upstream energy company operating oil and gas fields in Indonesia
- First sales gas from the SE-MGH field was achieved November 10, 2026, with production averaging 7.4 MMcf/d over the first two weeks
- Q3 2026 petroleum sales totalled C$7,210,000; year-to-date cash flow from operations rose 42% versus the prior-year period
- Investors may watch how contracted gas revenues affect balance sheet negotiations with lenders and fund planned 2027 drilling at Macan Gedang and Cerah
SE-MGH Field Delivers Early Gas Production Above Initial Expectations
Criterium reports that SE-MGH, a 21 billion cubic foot field, reached first sales gas on November 10, 2026, with the SEM-01 well averaging 7.4 MMcf/d across two choke settings during the first two weeks of production. The company also notes that approximately 150 barrels of condensate have been produced to date, averaging 12–13 bbl/d. Under the terms of its Gas Sales Agreement, Criterium receives a fixed price of US$7.00/MMBtu on a take-or-pay basis, which at a measured heating value of 1,117 Btu/scf equates to approximately US$7.82/Mcf. At current production levels, the company anticipates gross monthly gas sales revenue of approximately US$1.7 million, assuming a 31-day month at a constant rate of 7.4 MMcf/d less fuel gas and processing losses.
Q3 2026 Financials Reflect Narrowing Losses and Rising Oil Realizations
For the three months ended September 30, 2026, Criterium recorded petroleum sales of C$7,210,000 and an operating netback of C$33.21 per barrel. The company narrowed its net loss by 42% and increased net revenue by 5% year over year. Operating expenses declined 15% year to date. For October 2026, Criterium realized an oil price of US$120/bbl, reflecting a premium to Indonesian and Dated Brent benchmarks. The company's cash position stood at C$1.9 million as at September 30, 2026, compared with C$2.0 million at December 31, 2025, with capital during the quarter directed toward maintenance at the MGH and PLT oil fields and preparations for N-MGH development.
Next-Phase Gas Developments at N-MGH, Macan Gedang, and Cerah Move Forward
Following SE-MGH first gas, Criterium has commenced front-end engineering design and surveying for N-MGH, which holds 5 Bcf of 2P reserves and is anticipated to contribute 2–3 MMcf/d of future production. At Macan Gedang, which holds 13 Bcf of 2C resource and has tested at rates of up to 5 MMcf/d, the company has discussed a fast-track "Put on Production" mechanism with Indonesian regulator SKK MIGAS. The Cerah prospect, holding 34 Bcf of 2U resource, has completed access road assessments ahead of drilling Cerah-2. Drilling at both Macan Gedang and Cerah is scheduled for 2027, with preparations for longer lead-time items beginning in Q4 2026.




Please wait processing your request...