Imagine Lithium Inc. (TSXV: ILI) (OTCQB: ARXRF) has announced the commencement of its Fall 2026 exploration drilling program at the Jackpot Project in Ontario, with drill rigs now being mobilised to site. The 2,200-metre program will target resource expansion at the Casino Royale deposit and test the Ruth Pegmatite over 400 metres of strike. The announcement adds operational momentum to a project already carrying 3.1 Mt of Indicated and 5.3 Mt of Inferred Mineral Resources, drawing attention from investors tracking Canadian lithium exploration.

Key Points

  • Imagine Lithium Inc. (TSXV: ILI / OTCQB: ARXRF) has launched its Fall 2026 drill program at the Jackpot Project, approximately 140 km NNE of Thunder Bay, Ontario.
  • A 2,200-metre drill program targets resource expansion at the Casino Royale zone and tests the Ruth Pegmatite over 400 metres of strike length.
  • The project holds 3.1 Mt Indicated at 0.85% Li₂O and 5.3 Mt Inferred at 0.91% Li₂O; six high-priority exploration targets have also been identified across 27,597 hectares.
  • Investors may be watching for drill results and updates on environmental baseline and permitting preparation activities disclosed in this announcement.

Casino Royale and Ruth Pegmatite Drilling Targets at Jackpot

The Fall 2026 program focuses on two primary objectives: expanding the existing Mineral Resource at the Casino Royale deposit and conducting exploration drilling at the Ruth Pegmatite. The Ruth Pegmatite was exposed over a 233-metre strike length during fall 2025 field work, and the current program will test it across 400 metres. Prior channel sampling returned highlights including 1.34% Li₂O over 9.10 metres. The company stated the program is intended to provide insight into the continuity, grade, and width of the pegmatite. Inferred Mineral Resources carry a lower confidence level and have not demonstrated economic viability.

Six High-Priority Exploration Targets Identified Across the Property

Compilation of data collected between 2022 and 2025 has identified six high-priority lithium targets across the Jackpot Project. These include Jackpot South, Blay Lake, Newkirk SW, Cosgrave North, Jackpot West, and Jackpot Southwest. Sample highlights from these targets range up to 4.31% Li₂O at Blay Lake and 3.92% Li₂O at Cosgrave North, among others. The company cautions that grab and boulder samples are selective by nature and may not represent true grade or style of mineralisation. Several targets, including Jackpot South and Blay Lake, are being advanced in preparation for a disclosed Winter 2027 drill program.

Broader Program Includes Engineering Studies and Permitting Groundwork

Beyond drilling, Imagine Lithium disclosed that the broader exploration program will include bedrock stripping at Newkirk SW, geological mapping at Jackpot West and Jackpot Southwest, and advancement of metallurgical optimisation and preliminary engineering studies. The company also announced it is initiating environmental baseline studies and permitting preparations to support future development. The Jackpot Project benefits from proximity to the Trans-Canada Highway, power infrastructure, railroads, and ports, which the company highlights as a logistical advantage. Technical content was reviewed and approved by Jason Arnold, P.Geo., a qualified person as defined under National Instrument 43-101.