Lincoln Gold Mining Inc. (TSXV: LMG | OTCQB: LNCLF | FSE: ZMG) has announced two key development milestones at its Bell Mountain Gold-Silver Project in Churchill County, Nevada: the successful renewal of its Water Pollution Control Permit and positive results from development pumping of the project's existing alluvial water well. The renewed permit authorises processing of up to 1,500,000 tons of ore per year and runs through November 11, 2031. Investors may be watching these updates as the company advances pre-construction engineering and environmental compliance activities toward a potential construction decision.
Key Points
- Lincoln Gold Mining Inc. (TSXV: LMG | OTCQB: LNCLF | FSE: ZMG) is a Canadian mineral development company focused on gold projects in Nevada.
- The Nevada Division of Environmental Protection renewed the Bell Mountain Water Pollution Control Permit, effective November 12, 2026 through November 11, 2031.
- Development pumping confirmed the existing alluvial well can sustain approximately 200 gallons per minute, consistent with 2017 results, with aquifer capacity to support higher rates.
- Investors should watch progress on pre-operational permit requirements, engineering activities, and financing as the company moves Bell Mountain toward a potential construction decision.
Bell Mountain Water Pollution Control Permit Renewed Through 2031
The Nevada Division of Environmental Protection's Bureau of Mining Regulation and Reclamation issued the renewed Water Pollution Control Permit for Bell Mountain, which became effective November 12, 2026. The permit authorises construction, operation, and closure of approved mining facilities, including processing of up to 1,500,000 tons of ore per year. NDEP's public comment period concluded October 2, 2026, with no public comments received. The renewed permit covers pre-operational requirements related to water supply, groundwater monitoring, notification, inspection, and broader environmental compliance measures that Lincoln will continue to address alongside its engineering programme.
Alluvial Water Well Pumping Results Support Water Supply Planning
During approximately 1.5 hours of pumping, the existing Bell Mountain alluvial water well maintained an estimated discharge rate of approximately 200 to 210 gallons per minute, with only modest drawdown observed in both pumping and nearby monitoring wells. Following shutdown, the well recovered to its pre-pumping water level within approximately one minute. AquA Hydrogeologic Consulting reported that the well is capable of producing approximately 200 gallons per minute on a sustained basis, with aquifer capacity to support higher pumping rates using appropriately sized equipment — an encouraging result for the project's water supply planning.
2026 Results Consistent with Historical 2017 Well Evaluation at Bell Mountain
The release states that the 2026 pumping observations were consistent with a January 2017 evaluation of the same well, including similar water levels and discharge rates. This consistency across nearly a decade reinforces confidence in the aquifer's reliability. Joseph Sawyer, P.E., President of Lincoln's Nevada operations and the designated Qualified Person under National Instrument 43-101, reviewed and approved the technical disclosure. The Bell Mountain Project is designed as a conventional open-pit, heap-leach gold-silver operation encompassing the Spurr, Varga, Sphinx, and East Ridge deposits, located approximately 40 miles east of Fallon, Nevada.




Please wait processing your request...