Lion Copper & Gold Corp. (CSE: LEO) (OTCQB: LCGMF) has released its maiden Mineral Resource Estimate (MRE) for the Bear Deposit within its Yerington Copper Project in Lyon County, Nevada. The estimate outlines an Indicated Resource of 6.71 billion pounds of contained copper and an Inferred Resource of 8.77 billion pounds, materially expanding the company's district-scale copper endowment. The Bear Deposit is contiguous with Lion's flagship Yerington Copper Project, and investors may be watching how this resource underpins the ongoing Definitive Feasibility Study and the earn-in arrangement with Nuton LLC, an indirect subsidiary of Rio Tinto.

Key Points

  • Lion Copper & Gold Corp. (CSE: LEO / OTCQB: LCGMF)
  • Maiden MRE for the Bear Deposit delivers 6.71 billion pounds Indicated copper (1,064 Mt at 0.29% Cu) and 8.77 billion pounds Inferred copper (1,770 Mt at 0.22% Cu)
  • MRE effective date is July 21, 2026; a supporting NI 43-101 Technical Report is to be filed within 45 days of the announcement
  • Investors may watch for integration of Bear into district-level mine planning alongside the Yerington Copper Project's Definitive Feasibility Study

Bear Deposit MRE Adds Significant Scale to Lion's Yerington Copper Project

The maiden MRE for the Bear Deposit was prepared by independent Qualified Person Tim Maunula, P.Geo., of T. Maunula & Associates Consulting Inc., in accordance with CIM Definition Standards. Resources are reported at a copper cut-off grade of 0.10% Cu within a resource pit shell, applying a net copper price assumption of US$4.22 per pound and 75% metallurgical recovery for sulfide material. The model is based on 79 drill holes and 25,825 assays, with an ordinary kriging interpolation method applied across blocks measuring 25m x 25m x 15m. With approximately 43% of contained copper classified as Indicated, the company states the estimate provides a foundation for future engineering studies.

Geological Setting and Resource Expansion Potential at Yerington

The Bear Deposit is interpreted as a large porphyry copper system within the Yerington District of Nevada. The resource model incorporated five geographic and five mineralised domains, with Indicated and Inferred categories constrained to drill spacings of less than 250 metres and 400 metres respectively. The deposit remains open for expansion, and the release states future activities are expected to focus on expanding mineralisation and upgrading portions of the Inferred Mineral Resource through additional drilling. The Bear Deposit is contiguous with the Yerington and MacArthur deposits, reinforcing the district-scale development thesis the company has outlined.

Nuton LLC Earn-In Agreement Shapes Bear Deposit's Development Path

The Bear Deposit forms part of the Mining Assets subject to an Earn-In Agreement with Nuton LLC, an indirect wholly owned subsidiary of Rio Tinto America Inc., formalised in December 2025. Under that arrangement, Nuton has the sole and exclusive right to acquire not less than 65% of a newly formed LLC holding the Mining Assets, subject to satisfying applicable funding requirements. The release notes Nuton's evaluation activities remain focused on the Yerington Copper Project and assessing potential application of Nuton® Technology in the sulfide deposits. Lion received a further funding instalment from Nuton in January 2026 to advance the Definitive Feasibility Study and associated permitting activities.