Metals Creek Resources Corp. (TSXV: MEK) has announced high-grade gold assay results from the final diamond drill hole of its recently completed three-hole program at the Ogden Gold Project near Timmins, Ontario. Drill hole TOG-26-77 returned a downhole intercept of 7.25 g/t gold over 7.45 metres, including 13.46 g/t gold over 2.54 metres with visible gold. The results add to a series of high-grade intercepts from the program, reinforcing investor interest in the depth potential of the Thomas Ogden Zone fold structure.

Key Points

  • Metals Creek Resources Corp. (TSXV: MEK | OTC Pink: MCREF | FSE: M1C1)
  • TOG-26-77 returned 7.25 g/t Au over 7.45m, including 13.46 g/t Au over 2.54m with visible gold
  • A secondary intercept of 1.15 g/t Au over 4.65m was identified in the footwall intermediate dike; the three-hole program totalled 1,233 metres
  • Investors may be watching whether visible gold in all three program holes signals consistent high-grade continuity at depth along the Thomas Ogden Zone

TOG-26-77 Drill Results and Visible Gold at Depth

TOG-26-77 was designed to define the lower portion of the Thomas Ogden Zone fold structure and was the deepest hole in the program. The release states that mineralisation is hosted within strongly carbonate-altered and silicified felsites and albitized conglomerates with associated pyrite and minor arsenopyrite. Visible gold was recorded in two locations within the hole. A secondary zone at the northern contact of the footwall intermediate dike and ultramafics returned 1.15 g/t Au over 4.65 metres, with disseminated pyrite and local quartz veining noted. True widths of the mineralisation were not determined at the time of the announcement.

Program-Wide Results Strengthen the Thomas Ogden Zone Picture

All three holes in the program encountered visible gold, which the company notes compares favourably to a historical visible gold rate of approximately 35% across prior TOG drilling. TOG-26-76 returned 115.51 g/t Au over 9.85 metres, recorded as the second-highest grade intercept in the project's history. TOG-26-75 returned 8.43 g/t Au over 13.25 metres, including 40.61 g/t Au over 2.4 metres. The company states the results suggest the deeper portion of the Thomas Ogden Zone carries potentially similar gold tenor to the shallower western portion of the fold structure.

Ogden Gold Project Structure and Joint Venture Context

The Ogden Gold Project is located approximately six kilometres south of Timmins, Ontario, along an eight-kilometre strike length of the Porcupine-Destor Fault. The project is a 50/50 joint venture between Metals Creek and Discovery Mining Ltd., with Metals Creek serving as operator. The qualified person responsible for the technical disclosure is Michael MacIsaac, P.Geo and VP Exploration. Samples were analysed by Activation Laboratories in Thunder Bay, Ontario, using standard fire assay methodology, with pulp metallic analysis applied to samples showing visible gold or results above 5.0 g/t gold. The immediate share price impact was not clear from available public information.