Prince Silver Corp. (CSE: PRNC) has released a corporate and exploration update confirming it has completed more than 10,000 metres of drilling at its flagship Prince Silver Project in Nevada's historic Pioche Mining District. The company is currently drilling hole PRC-63 — its 38th hole since launching its own exploration program — and is integrating historical and modern datasets to support a maiden NI 43-101 compliant mineral resource estimate targeted for early 2027. Investors may be watching closely as twin-hole validation results and additional assay data are anticipated through the fall.
Key Points
- Prince Silver Corp. (CSE: PRNC | OTCQX: PRNCF | FSE: T130)
- More than 10,000 metres drilled at the Prince Silver Project in Lincoln County, Nevada; hole PRC-63 currently underway
- Maiden NI 43-101 compliant mineral resource estimate targeted for early 2027; twin-hole validation program recently completed with assays pending
- Investors should watch for additional assay results, twin-hole outcomes, and metallurgical study updates through fall 2026
Polymetallic Mineralization Confirmed Across Historical and Modern Drilling at Prince
The Prince Silver Project has returned broad silver-gold-manganese-lead-zinc intervals across multiple stratigraphic horizons in both historical and current drilling programs. Historical holes PRC-10 through PRC-25 intersected wide mineralized zones, including PRC-11 at 53.34 metres grading 0.37 g/t gold and 97.82 g/t silver, and PRC-24 at 24.38 metres grading 0.29 g/t gold and 123.38 g/t silver. Modern drilling has continued to encounter similar mineralisation styles, with deeper holes also highlighting a gold-silver-rich sulphide component. The release notes that no new assay results are being reported in this update; all intervals cited are previously disclosed figures.
Twin-Hole Validation Program Lays Groundwork for NI 43-101 Resource Estimate
A key step toward the maiden mineral resource estimate was the recently completed twin-hole program, in which Prince Silver drilled holes adjacent to selected historical drill collars to directly compare geology, mineralised interval widths, grades, and positions with historical records. Assay results from these twin holes remain pending. The company's technical team and independent resource consultants will review the data to assess what portion of the historical database can be incorporated into the resource estimate. The release states the combined dataset could materially strengthen the geological model and provide additional drilling density as work advances.
$4.75 Million Financing and OTCQX Graduation Strengthen Prince Silver's Position
Earlier in 2026, the company completed an upsized $4.75 million financing and more than doubled its land position at the Prince Project. Prince Silver also graduated to the OTCQX Best Market under the symbol PRNCF. These developments, as described in the announcement, are intended to support the next phase of exploration and resource-development work. The company is scheduled to present at the Metals Investor Forum in Vancouver on September 18, 2026, the New Orleans Investment Conference from October 28–31, and the Gold Advisor Summit on November 5, 2026.




Please wait processing your request...