Red Metal Resources Ltd. (CSE: RMES) (OTC: RMESF) (FSE: I660) has announced that its wholly owned Chilean subsidiary, Minera Polymet SpA, has entered into a renewable five-year lease agreement with local artisanal mining company Construcción Minería y Servicios Catalina Ltda. for the Irene and Margarita copper-gold mineral concessions near Vallenar, Chile. Under the arrangement, Red Metal will receive a 10% royalty on gross mineral sales to ENAMI, with a guaranteed minimum of US$1,000 per month beginning in the third month. The agreement marks the company's second small-scale mining lease in its Chilean portfolio, providing royalty income while Red Metal retains full exploration rights over the property.
Key Points
- Red Metal Resources Ltd. (CSE: RMES) announced the lease via a news release dated August 12, 2026
- Minera Polymet SpA has leased approximately 106 hectares of copper-gold concessions to CMS Catalina under a renewable five-year agreement
- A 10% gross royalty applies after a three-month grace period, with a guaranteed minimum of US$1,000 per month; production is targeted to reach a minimum of 2,500 tonnes per month following ramp-up
- Investors may be watching whether CMS Catalina obtains required Chilean permits and meets minimum production thresholds within the grace period
Lease Structure and Royalty Terms for the Irene-Margarita Property
During an initial three-month grace period, CMS Catalina will work to secure Chilean production permits for up to 5,000 tonnes per month, authorisation for an explosives storage facility, and an approved exploitation and closure plan, while also upgrading road access. Following the grace period, an escalating delivery schedule is anticipated: 1,000 tonnes in the first month, 1,500 tonnes in the second, and a minimum of 2,500 tonnes per month thereafter. If CMS Catalina fails to sustain the minimum production threshold post-ramp-up, Minera Polymet retains the right to terminate the lease.
Historical Mineralisation at the Irene Mine Near Vallenar
The Irene-Margarita Property consists of three concessions totalling approximately 106 hectares, located roughly 15 kilometres east of Vallenar in Chile's Atacama Region, near ENAMI's processing facility. The company has held these concessions since 2009. Historical records from ENAMI indicate that approximately 16,144 tonnes were mined from the Irene property in the 1990s at an average grade of 3.2% copper, 43.7 grams per tonne silver, and 0.72 grams per tonne gold. The company cautions that these historical results have not been independently verified by a Qualified Person and should not be relied upon as indicative of future production.
Red Metal's Strategy of Generating Revenue From Chilean Assets
Red Metal Resources President and CEO Caitlin Jeffs stated the lease "brings a second small-scale mining agreement into our Chilean portfolio, generating royalty revenue from our Irene and Margarita concessions while supporting experienced local miners in the Vallenar district." The company emphasised that Red Metal retains the right to explore the concessions at all times. Importantly, no feasibility study or mineral resource estimate under National Instrument 43-101 has been prepared for the property, and there is no assurance that royalty revenue will be realised as anticipated.


Please wait processing your request...