Scottie Resources Corp. (TSXV: SCOT) has released additional high-grade gold drill results from its 2026 program at the Blueberry Contact Zone within the Scottie Gold Mine Project in British Columbia's Golden Triangle. Headline intercepts include 25.5 g/t gold over 14.00 m across the Blueberry 3 and 4 veins, and a separate 120.0 g/t gold over 1.50 m hit below the modelled Blueberry 5 vein. The results reinforce grade continuity and suggest potential to expand the existing resource and preliminary economic assessment mine design, with investors watching for an updated Mineral Resource Estimate and Feasibility Study both targeted for the first half of 2027.
Key Points
- Scottie Resources Corp. (TSXV: SCOT) (OTCQB: SCTSF) (FSE: SR80)
- Drill hole SR26-560 returned 25.5 g/t gold over 14.00 m at Blueberry 3 and 4; hole SR26-522 returned 120.0 g/t gold over 1.50 m below the modelled Blueberry 5 vein
- The 2026 program totalled 61,578 m across 227 holes; assay results for the majority of holes remain outstanding
- Investors may be watching for the updated Mineral Resource Estimate and Feasibility Study, both targeted for the first half of 2027
Blueberry 3 and 4 Vein Systems Deliver Headline Intercepts
Hole SR26-560 returned 25.5 g/t gold over 14.00 m, including 17.6 g/t gold over 8.00 m at Blueberry 3 and 72.1 g/t gold over 3.00 m at Blueberry 4. The company notes this intercept is located approximately 20 m beyond the existing PEA stope outline, reinforcing the established mineralised system while indicating the mineable envelope could extend beyond the current mine design. A separate hole, SR26-522, intersected 120.0 g/t gold over 1.50 m approximately 20 m below the modelled Blueberry 5 vein, which the release states highlights potential for additional high-grade mineralisation beyond currently modelled structures.
Fifi and Lemoffe Vein Systems Show Expansion Potential
At the Fifi vein system, hole SR26-563 returned 10.1 g/t gold over 11.00 m, including 50.1 g/t gold over 2.00 m in the upper Fifi 1 zone, approximately 40 m beyond the 2025 PEA stope outline. Hole SR26-540 returned 5.8 g/t gold over 6.85 m at Fifi 2, approximately 30 m outboard of the existing PEA stope outline. At Lemoffe 4, hole SR26-525 intersected 8.5 g/t gold over 3.75 m just outside the existing resource, with additional results from SR26-564 and SR26-559 further reinforcing grade and continuity across the Lemoffe system, the announcement states.
2026 Drill Program Concluded; Updated Resource and Feasibility Study Targeted for 2027
The 2026 drilling program at the Scottie Gold Mine Project has concluded, with 61,578 m drilled across 227 holes. The company notes that assay results for the majority of holes remain outstanding. The current Inferred Mineral Resource stands at 3.6 million tonnes grading 6.1 g/t gold, containing 703,000 ounces, and does not incorporate approximately 27,000 m of 2025 drilling or the more than 60,000 m completed during 2026. Results from both programs will inform an updated Mineral Resource Estimate and Feasibility Study, both planned for the first half of 2027. The immediate share price impact was not clear from available public information.


Please wait processing your request...