Wayfinder Metals Corp. (CSE: WMC) has signed a non-binding letter of intent with Mirasol Resources Ltd. (TSXV: MRZ) to earn up to an 85% interest in the La Curva and Libanesa gold-silver projects in Santa Cruz Province, Argentina. The two exploration-stage properties cover more than 30,000 hectares within the Deseado Massif, a district that hosts nine operating mines and 12 advanced projects. The staged earn-in structure could position Wayfinder as majority owner of a significant precious metals land package, making this announcement a material development for investors watching the company's project pipeline.

Key Points

  • Wayfinder Metals Corp. (CSE: WMC), formerly Westmount Minerals Corp., is an Edmonton-based precious and base metal exploration company.
  • The company signed a non-binding LOI with Mirasol Resources Ltd. to earn up to an 85% interest in the La Curva and Libanesa gold-silver projects in Argentina's Deseado Massif.
  • Cumulative earn-in commitments total US$1,000,000 in cash and 25,000 metres of drilling over approximately 5.5 years, with milestone bonus payments of up to US$4,000,000 possible.
  • Investors should watch for execution of a definitive agreement and completion of a minimum $1,000,000 Initial Financing within 120 days of that signing.

Staged Earn-In Structure Across Three Options at La Curva and Libanesa

Under the proposed transaction, Wayfinder can acquire a 51% interest (First Option) by paying US$175,000 in cash, completing 5,000 metres of drilling, and issuing Wayfinder shares representing 9.9% of issued and outstanding shares within 18 months of a definitive agreement. A Second Option would increase ownership to 65% upon US$250,000 in additional cash and 8,000 metres of drilling, while a Third Option would bring the total to 85% with cumulative cash payments of US$1,000,000 and 25,000 metres of drilling across roughly 5.5 years. Failure to exercise a subsequent option triggers reversion or reduction of the acquired interest back to Mirasol.

Historical Drill Results Highlight Gold-Silver Continuity at Both Properties

Historical exploration at La Curva identified two 6-kilometre mineralized structural corridors, with surface samples returning up to 66.8 grams per tonne gold and up to 153.6 grams per tonne silver. Among the highlights, drillhole SW-DDH-002 intercepted 41.3 metres of 0.85 g/t gold and 2.45 g/t silver, while CC-RC-001 returned 13.0 metres of 1.57 g/t gold and 10.82 g/t silver. At Libanesa, surface grab sampling returned up to 546 g/t gold and 3,910 g/t silver, and drilling at Cerro Plomo intercepted 27.0 metres of 0.37 g/t gold and 43.67 g/t silver. The company notes these historical results have not been independently verified by Wayfinder.

Milestone Bonuses and Post-Earn-In Joint Venture Arrangements

The LOI includes two bonus payment triggers: a US$1,000,000 payment upon delivery of a NI 43-101 mineral resource estimate exceeding 1.25 million ounces of gold equivalent on either project, and a further US$1,000,000 upon a formal mine development decision by Wayfinder's board. Maximum aggregate bonuses are capped at US$4,000,000. Upon reaching 85% ownership, Mirasol may elect either an 85:15 participating joint venture or convert its 15% interest into a 5% carried interest plus a 2% net smelter returns royalty, with Wayfinder holding the right to repurchase 1% of the NSR for US$1,500,000.