Highlights
- Q3's gold output totaled 115,213 ounces; copper production reached 12.0 million pounds.
- Rainy River generated 100,301 ounces, contributing to USD 205M in free cash flow.
- The company repaid USD 260M in debt, including full repayment of its USD 150M credit facility.
New Gold Inc. (TSX:NGD) reported third-quarter 2025 production of 115,213 ounces of gold and 12.0 million pounds of copper. Operating expenses averaged USD 874 per gold ounce sold, and all-in sustaining costs were USD 966 per gold ounce sold. The company generated USD 301M in operating cash flow and achieved record free cash flow of USD 205M, including USD 183M from Rainy River.
President and Chief Executive Officer Patrick Godin stated, “New Gold delivered a strong third quarter, highlighted by multiple records for production and free cash flow generation. Rainy River produced over 100,000 ounces of gold in the quarter, a 63% increase over the second quarter, as the open pit continued to perform as expected following the release of the higher-grade material in June.”
Segment Performance
Rainy River
The Rainy River mine produced 100,301 ounces of gold in Q3 2025, marking a 63% increase from the previous quarter. AISC averaged USD 1,043 per ounce, down 39% quarter-over-quarter due to higher-grade open pit ore. Year-to-date output totaled 195,813 ounces, representing about 70% of the midpoint of annual guidance (265,000–295,000 ounces).
Underground operations advanced with initiatives to enhance recruitment, retention, and development productivity. The mill demonstrated capacity to meet 2026 production targets outlined in the Rainy River Technical Report.
New Afton
New Afton produced 14,912 ounces of gold and 12.0 million pounds of copper, with AISC of (USD 595) per gold ounce sold. The B3 cave averaged 4,300 tonnes per day, continuing to exceed performance expectations. Construction of the C-Zone was 79% complete at the end of September, with an output increase anticipated in Q4 2025.
For the first nine months of 2025, New Afton achieved roughly 77% of annual gold guidance (60,000–70,000 ounces) and 71% of copper guidance (50–60 million pounds).
Financial Position and Outlook
During the quarter, New Gold repaid USD 260M in debt, including the USD 111M redemption of 2027 Notes and full repayment of the USD 150M drawn on its credit facility ahead of schedule. The company ended the quarter with USD 123M in cash and equivalents.
Full-year 2025 gold production remains in line with guidance of 325,000–365,000 ounces, with Rainy River expected above the midpoint and New Afton near the midpoint. Copper output is projected around the midpoint of the 50–60-million-pound guidance range.
Consolidated AISC is tracking toward the higher end of USD 1,025–1,125 per ounce, reflecting increased share-based expenses. Sustaining capital is trending toward the low end of USD 95–110M, while growth capital is expected near the midpoint of USD 175–205M.
Exploration and Project Development
At Rainy River, surface drilling extended mineralization along the NW Trend, while underground drilling expanded mining zones that remain open at depth. At New Afton, K-Zone drilling doubled the known mineralized extent, with a maiden resource estimate expected in early 2026.
Mr. Godin concluded, “The Company demonstrated that our two assets are delivering on production and this performance shows we are well positioned to deliver on our longer-term plan.”






Please wait processing your request...