Image source: © 2025 Krish Capital Pty.Ltd
Highlights
• Drill hole ML24-1049DA returned 55.18 gpt AuEq over 20.1 m at northern EPO
• Drilling supports resource expansion and potential category upgrade by year-end 2025
• Over 233,000 oz AuEq added to Inferred Resources from 2024 program
Torex Gold Resources Inc. (TSX:TXG) released new assay results from its 2025 drilling campaign at the EPO deposit, located within the Morelos Property in Mexico. The program targets the northern extension of EPO and supports Torex’s objective to expand and upgrade resources in the area.
Among the most significant intercepts reported was from drill hole ML24-1049DA, which returned 55.18 grams per tonne gold equivalent (gpt AuEq) over 20.1 metres, and 2.97 gpt AuEq over 13.4 metres. These results confirm a vertical mineralized column of at least 100 metres and support the geological continuity of the zone north of the La Avispa fault.
Earlier drilling highlights included hole ML24-1042, which intercepted 4.92 gpt AuEq over 35.7 metres and 8.98 gpt AuEq over 20.1 metres. Follow-up drilling in the same area, notably ML24-1048D and ML24-1055D, returned multiple mineralized intercepts including 6.17 gpt AuEq over 15.0 metres and 5.60 gpt AuEq over 13.9 metres, further supporting resource extension in the northern sector.
The 2024 EPO program previously contributed approximately 233,000 gold equivalent ounces to Inferred Resources. The current year’s focus remains on extending mineralization to the north and upgrading Inferred Resources to the Indicated category in the upcoming 2025 mineral reserve and resource update.
As of July 16, 2025, the footprint of the mineralized zone extends approximately 500 by 200 metres, with vertical continuity exceeding 100 metres. Mineralization remains open to the north, where drilling is concentrated along the west-northwest La Avispa fault zone, which hosts a series of pre-mineral dikes linked to mineralization feeders.
EPO is part of the Media Luna Cluster within Torex’s Morelos Complex, where production is targeted to begin by late 2026. The Company’s current internal estimates aim to sustain a minimum annual production level of 450,000 gold equivalent ounces through 2030.






Please wait processing your request...