Winter drilling results now in hand

Total Metals Corp (TSXV:TT) is reassessing its Electrolode critical-minerals project in northwestern Ontario after reporting all results from a 25-hole, 8,408-metre winter drilling programme. The company has released assays for every hole, highlighted several high-grade zinc-copper intervals at the Arrow Zone, and said its next step is to remodel the data, evaluate deeper-penetrating geophysics and, if warranted, seek a new exploration permit to reach targets beneath Garnet Lake. The story has moved from drilling to interpretation, and the company has not yet announced a follow-up programme or a funded budget for one.

Total Metals trades on the TSX Venture Exchange, with secondary quotations on the OTCQB (TTTMF) and in Frankfurt.

Electrolode and the wider portfolio

Electrolode covers more than 3,300 hectares about 69 kilometres from Ear Falls, within reach of the Red Lake mining camp. The company describes the property as fully permitted for exploration drilling and hosting ten historic mineralised zones. Its most advanced target, the Arrow Zone, has a National Instrument 43-101 Inferred Mineral Resource, effective 1 June 2025, of 2.11 million tonnes grading 0.66% copper, 4.74% zinc, 17.92 g/t silver and 0.66 g/t gold. Inferred resources carry a low level of geological confidence and cannot be assumed to convert to reserves.

Beyond Electrolode, Total Metals holds the High Lake and West Hawk Lake gold properties, together 958 hectares straddling the Manitoba-Ontario border, an option on the Menary gold property in the Kenora Mining Division, and the Pick Lake property, which comprises 75 claims and a mining lease covering more than 5,260 hectares. Pick Lake carries a historical estimate prepared in 2020 that includes 1.78 million tonnes of Indicated material at 19.2% zinc, 0.9% copper, 0.3 g/t gold and 36.1 g/t silver. The company presents this as historical; a qualified person has not done the work needed to classify it as a current resource.

What the 2026 drilling found

The winter programme began in late January with a planned 5,500 metres and expanded after a second rig arrived in February. Drilling ended in mid-April. The company says it tested the top tenth of targets ranked using drone magnetics, an airborne electromagnetic survey, three-dimensional conductor modelling, mapping, soil geochemistry and re-logging of historical core.

Results from the first ten holes, released on 22 June 2026, came from the Arrow and Garnet area. Hole EL-26-006 cut 16.91% zinc and 3.59% copper over 1.91 metres in a hanging-wall zone, within a broader 4.30 metres at 7.81% zinc and 1.90% copper, and separately 8.40% zinc over 4.00 metres in the Arrow Zone. EL-26-003A returned 7.00% zinc and 0.47% copper over 7.18 metres, and EL-26-004 returned 3.85% zinc over 9.75 metres. These are core lengths, not true widths. The company also reported elevated gallium and indium in some intercepts but said their distribution and recoverability are unknown. It acknowledged that the Garnet results weakened the case for continuity between Garnet and Arrow.

The remaining 15 holes, released on 13 July 2026, tested the Copperlode area and other conductors. The standout was EL-26-013 at the Hornet Zone, with 7.67 metres of 2.90% zinc and 1.15% copper about 395 metres below surface, including 1.74 metres at 3.19% copper. Several other holes returned narrower or lower-grade intervals, and three returned no significant results. Chief executive Tyler Thorburn said the company has a clear line of sight to resource growth; that is management's view, not an estimate, and no updated resource has been published.

Funding, share count and dividends

Total Metals funded the programme through financings closed in late 2025. In early December 2025 it closed a first tranche of units at C$0.90 for gross proceeds of about C$2.71 million, each unit including a full warrant exercisable at C$1.15 for three years. On 8 December 2025 it closed a first tranche of flow-through financing for about C$5.22 million, issuing critical-mineral flow-through units at C$1.15 and flow-through units at C$1.05. Flow-through money must be spent on eligible Canadian exploration, with renunciation to subscribers effective no later than 31 December 2026.

In February 2026 the company said it had decided not to fund a previously announced loan agreement with Kattegat Mining, and disclosed a US$250,000 investor-awareness agreement with i2i Marketing Group. There were 59,315,766 shares issued in May 2026, when the stock closed at C$0.25, well below the late-2025 financing prices. None of the recent drilling releases disclosed a cash balance, so readers should consult the latest interim filings for current working capital. As a pre-revenue explorer, Total Metals pays no dividend.

Market conditions for zinc-copper explorers

Electrolode is a volcanogenic massive sulphide-style system, so its appeal depends on zinc and copper prices as well as precious-metal credits. Canadian policy support for critical minerals, including the enhanced flow-through incentive the company used, has helped juniors raise money for such projects. Still, base-metal prices are cyclical, and small explorers compete for capital with larger developers in the same commodities.

Risks and what comes next

The main risks are geological and financial. Many winter intercepts were narrow, the Garnet results reduced confidence in one interpreted connection, and the company believes historical conductor models may have missed depth beyond roughly 350 metres, which is a hypothesis still to be tested. Any new programme beneath Garnet Lake would need a fresh permit. The share price sits far below the 2025 issue prices, which could make future fundraising more dilutive, and outstanding warrants at C$1.15 are well out of the money. Gallium and indium values are encouraging but untested for recovery.

Disclosed next steps include integrating ground and borehole geophysics with drill logs, evaluating deeper geophysical methods, re-ranking targets, possibly applying for a new permit, and further mineralogical work on gallium and indium. Drilling of the Arrow Zone has been flagged for when frozen-ground conditions allow, which points to winter. The company has not set a date for an updated resource, so investors will be watching for a funded 2027 plan and fresh disclosure on its treasury.