Rua Gold Inc. (TSX:RUA) has put its first set of economic numbers on the Auld Creek gold-antimony project in New Zealand's Reefton goldfield. The preliminary economic assessment (PEA), released on 5 May 2026, outlines a small, high-grade underground mine producing two concentrates, one of gold and one of antimony. At a base-case gold price of US$3,300/oz and antimony at US$27,000 per tonne, it shows an after-tax net present value (NPV, 5% discount rate) of US$42.4 million and an after-tax Internal rate of return (IRR) of 17%.
The study's main message is that Auld Creek is a two-metal project. Antimony is a large part of the value, and the Economics are highly sensitive to both prices. Rua Gold graduated from the TSX Venture Exchange to the Toronto Stock Exchange in February 2026 under the ticker RUA. It is also listed on the NZX as RGI, and its shares trade over the counter in the United States as NZAUF and in Frankfurt as X9R.
Company overview
Rua Gold is a New Zealand-focused explorer. It holds more than 120,000 hectares of permits in the historic Reefton goldfield on the South Island, plus the Glamorgan project in the North Island's Hauraki district. Auld Creek, which the company owns 100%, is its most advanced asset.
How it came to the TSX
Rua Gold's shares began trading on the Toronto Stock Exchange on 17 February 2026, moving up from the TSX Venture Exchange. The company already had an NZX listing, which gives New Zealand investors direct access to the shares. The uplisting came as the company shifted its focus from exploration to studies and permitting at Auld Creek.
What the Auld Creek PEA outlines
The PEA has an effective date of 25 April 2026 and was filed on SEDAR+ as an NI 43-101 technical report on 19 June 2026. It plans an underground operation run by contractors and mined mainly by overhand cut-and-fill. Stopes would be backfilled, partly with dry-stacked tailings. The processing plant would treat 250,000 tonnes a year through a simple grind and flotation circuit, producing separate gold and antimony concentrates without cyanide. The PEA notes that high-grade mineralisation extends to about 200 metres below surface and remains open at depth. Key base-case figures include:
- Initial capital: US$132.6 million, including about 29% contingency; sustaining Capital US$63.9 million over the life of mine
- Mine life: 5.5 years, with average output of 26,665 oz gold-equivalent (AuEq) a year
- Life-of-mine production: 146,660 oz AuEq, made up of 84,482 oz gold and 8,995 tonnes of antimony
- Material mined: 1.357 million tonnes at 3.36 g/t AuEq, with assumed recoveries of 95% for gold and 85% for antimony
- Cash costs of US$1,400/oz and all-in sustaining costs (AISC) of US$1,850/oz; payback of 3.3 years
The study assumes a 25% New Zealand corporate tax rate and 2% royalties. In an upside case at US$4,700/oz gold, the after-tax NPV rises to US$113.0 million, with an IRR of 36% and a 2.2-year payback.
Why antimony matters so much
With gold held at US$3,300/oz, an antimony price of US$15,000 per tonne would turn the after-tax NPV negative, at minus US$25.3 million. At US$20,000 per tonne, the NPV falls to US$3.7 million. At US$40,000 per tonne, it rises to US$112.0 million, and at US$50,000 per tonne to US$164.7 million. The project is also sensitive to gold: at US$2,500/oz, with the base antimony price, the NPV is only US$0.6 million.
Auld Creek is effectively a combined exposure on gold and on a critical mineral. Antimony is used in flame retardants, batteries and defence applications, and Supply is concentrated in a few countries. A concentrate from outside those supply chains could attract strategic interest, but that depends on securing offtake and on how prices move.
The resource behind the study
The PEA is based on a mineral resource estimate with an effective date of 27 February 2026, using a cut-off grade of 1.6 g/t AuEq. The indicated resource is 0.3 million tonnes at 3.18 g/t gold and 1.2% antimony, containing 31,000 oz gold or 54,000 oz AuEq. The inferred resource is 1.3 million tonnes at 1.96 g/t gold and 0.8% antimony, containing 80,000 oz gold or 150,000 oz AuEq. Most of the resource is therefore inferred, which is typical at the PEA stage but means much of the mine plan needs infill drilling before a prefeasibility study (PFS).
Recent developments
When it released the PEA, Rua Gold said a 19,000-metre infill and extension drilling programme was under way and that it was targeting completion of a PFS in the fourth quarter of 2026. The company had also applied for a referral under New Zealand's fast-track approvals regime and was aiming to complete permitting in the second quarter of 2027. Rua Gold has since announced that Auld Creek qualified for the fast-track process, which the company describes as a six-month approvals pathway. It has also reported further drilling at Auld Creek, including results it described as its highest-grade intercepts at the project to date.
What investors are watching
The main near-term catalyst is the PFS, and whether infill drilling upgrades enough inferred material and cost estimates hold up. Progress through the fast-track process, and any conditions attached to approvals, will also be followed closely. Other important factors include the antimony price, the terms of any concentrate offtake agreements, and how the company plans to fund initial capital of more than US$130 million. Exploration at the wider Reefton permits and Glamorgan could also shape how the company is valued.
Risks to consider
The PEA is preliminary and includes inferred resources, which are considered too speculative geologically to have economic considerations applied that would allow them to be classed as mineral reserves. There is no certainty that the PEA results will be achieved. The base-case return is modest, and the sensitivity tables show that lower gold or antimony prices could erase most or all of the project's value. Selling antimony concentrate depends on specialist buyers and on treatment terms. Fast-track permitting still involves environmental and community processes, and funding, cost Inflation and currency movements add further uncertainty.
Conclusion
The Auld Creek PEA gives Rua Gold a first technical baseline: a short-life, high-grade, cyanide-free underground mine whose value rests heavily on antimony as well as gold. At base-case assumptions the numbers are positive but thin, improving sharply at higher metal prices. The PFS targeted for late 2026 and fast-track permitting are the next tests.