Stantec EDMONTON, Alberta and NEW YORK, April 30, 2025 (GLOBE NEWSWIRE) -- TSX, NYSE:STN Stantec, a global leader in sustainable design and engineering, has been selected by the City of Vancouver, Washington, to design a treatment system to remove per- and polyfluoroalkyl substances (PFAS) from a high-volume water station—with the goal of providing cleaner, more reliable drinking water for the community. Stantec will also provide engineering services during construction for the treatment facility at Vancouver’s Water Station 4, one of the first stations in Vancouver’s water supply that will treat water for PFAS. When complete, this PFAS filter system will treat up to 12.2 million gallons per day, making it the largest PFAS project in the Northwestern US in terms of treatment capability. In 2024, the U.S. Environmental Protection Agency (EPA) issued a requirement for all public water utilities in the US to reduce PFAS in drinking water by 2029. In accordance, cities and municipalities around the US are exploring proper treatment systems to address PFAS in their water supply. The EPA will also require public water systems to begin reporting on PFAS levels in 2027. According to industry research, PFAS treatment is estimated to cost water utilities approximately $40 billion. “Water and wastewater utilities across the US are taking important action to treat PFAS in their water supply,” said Matt Travers, Stantec executive vice president and business operating unit leader, Water. “For the City of Vancouver, we’re leveraging the strengths of our regional team along with national practitioners to address this challenge, meet regulatory standards, and provide long-term safety and reliability in the community’s drinking water supply.” Upgrades necessary to remove PFAS On average, the City of Vancouver delivers 10.1 billion gallons per year of drinking water to more than 270,000 people in a 72-square mile service area. In 2023, the City started a program to test for and report PFAS in drinking water, discovering that upgrades were necessary to properly treat and reduce PFAS contaminants to meet anticipated state and federal regulations. Stantec’s design will integrate the treatment system into the Water Station 4 site while keeping it functional and maintaining water supply for the City during construction. Treatment facility construction is expected to begin this October and be completed in early 2028, over a year ahead of the EPA’s compliance deadline for public water systems. Stantec is working with multiple public water utilities to address PFAS and help clients comply with state and federal regulations. Learn more about Stantec’s experience around PFAS and emerging contaminants. Story Continues About Stantec Stantec empowers clients, people, and communities to rise to the world’s greatest challenges at a time when the world faces more unprecedented concerns than ever before. We are a global leader in sustainable engineering, architecture, and environmental consulting. Our professionals deliver the expertise, technology, and innovation communities need to manage aging infrastructure, demographic and population changes, the energy transition, and more. Today’s communities transcend geographic borders. At Stantec, community means everyone with an interest in the work that we do—from our project teams and industry colleagues to our clients and the people our work impacts. The diverse perspectives of our partners and interested parties drive us to think beyond what’s previously been done on critical issues like climate change, digital transformation, and future-proofing our cities and infrastructure. We are designers, engineers, scientists, project managers, and strategic advisors. We innovate at the intersection of community, creativity, and client relationships to advance communities everywhere, so that together we can redefine what’s possible. Stantec trades on the TSX and the NYSE under the symbol STN. Visit us at stantec.com or find us on social media. Cautionary Note Regarding Forward-Looking Statements This news release contains forward-looking statements regarding the initiatives and projects described above. Forward-looking statements also include any other statements that do not refer to historical facts. By their nature, forward-looking statements are based on assumptions and subject to inherent risks and uncertainties. There is a risk that the initiatives and projects described above may be delayed, cancelled, suspended or terminated. This could cause future results to differ materially from the forward-looking statements made in this news release. Except as may be required by law, Stantec undertakes no obligation to publicly update or revise any forward-looking statements. Forward-looking statements are provided herein for the purpose of giving information about the initiatives and projects referred to above and their expected impact. Readers are cautioned that such information may not be appropriate for other purposes. Media Contact Jessica Love Stantec Media Relations Ph: (206) 279-1056 [email protected] Investor Contact Jess Nieukerk Stantec Media Relations Ph: (403) 569-5389 [email protected] View Comments
Stantec to design largest PFAS treatment system in Northwestern US
You are reading a free article with opinions that may differ from the recommendation given by Kalkine in its paid research reports. Become a Kalkine member today to get access to our research reports, in-depth technical and fundamental research. Learn more
Start Your Free Trial Now!Download Free Report – Explore 3 Stock Ideas & Industry Insights
Unlock 3 stock ideas and key industry insights in our free report. This information is general in nature and does not consider your personal objectives, financial situation, or needs. It is not financial advice.
All investments involve risk—consider independent advice before making any investment decisions.
View 3 Research ReportsThis information, including any data, is sourced from Unicorn Data Services SAS, trading as EOD Historical Data (“EODHD”) on ‘as is’ basis, using their API. The information and data provided on this page, as well as via the API, are not guaranteed to be real-time or accurate. In some cases, the data may include analyst ratings or recommendations sourced through the EODHD API, which are intended solely for general informational purposes.
This information does not consider your personal objectives, financial situation, or needs. Kalkine does not assume any responsibility for any trading losses you might incur as a result of using this information, data, or any analyst rating or recommendation provided. Kalkine will not accept any liability for any loss or damage resulting from reliance on the information, including but not limited to data, quotes, charts, analyst ratings, recommendations, and buy/sell signals sourced via the API.
Please be fully informed about the risks and costs associated with trading in the financial markets, as it is one of the riskiest forms of investment. Kalkine does not provide any warranties regarding the information on this page, including, without limitation, warranties of merchantability or fitness for a particular purpose or use.
Please wait processing your request...