Blue Star Gold Corp. (TSXV: BAU | OTCQB: BAUFF | FSE: 5WP0) has announced initial results from its 2026 Exploration Program Phase 2 drilling at the Nutaaq (North) target on its Ulu property in Nunavut's West Kitikmeot Region. All five drill holes intersected targeted structures with gold mineralisation, with standout hole 26UND003 returning 8.0 metres of 2.56 g/t gold including 1.5 metres of 7.41 g/t gold. The results indicate a wide hydrothermal system along the 1,600-metre Nutaaq trend, and the company states follow-up drilling is warranted to vector into higher-grade zones.
Key Points
- Blue Star Gold Corp. (TSXV: BAU | OTCQB: BAUFF | FSE: 5WP0)
- Phase 2 drilling at Nutaaq (North) returned 8.0 m of 2.56 g/t Au including 1.5 m of 7.41 g/t Au from hole 26UND003, and 3.4 m of 2.70 g/t Au from hole 26UND004
- All five initial holes intersected targeted structures within the 1,600-metre Nutaaq trend; the company controls over 420 sq km in the High Lake Greenstone Belt
- Investors may be watching for follow-up and infill drilling results intended to define higher-grade vectors and potential resource expansion at Nutaaq
Nutaaq North Drill Results Confirm Broad Gold-Bearing Hydrothermal System
Blue Star's five Phase 2 holes tested two parallel structures at North Nutaaq using wide-spaced drilling across 300-to-400-metre-long target zones. Hole 26UND003, a 70-metre step-out west of 2025 hole 25UND002, intersected multiple quartz veining and sulphide zones, returning 8.66 g/t Au over 1.2 metres from 49.8 metres depth, and 2.56 g/t Au over 8.0 metres from 74.0 metres, including a 1.5-metre interval of 7.41 g/t Au. Hole 26UND004 returned 2.70 g/t Au over 3.4 metres within a 3.8-metre alteration zone from 36.3 metres depth, confirming structural continuity along Structure B.
Mineralisation Style and Context Within the Ulu Property
Nutaaq-style mineralisation on Blue Star's Ulu property consists of northeast-to-southwest trending tension veins hosted within a magnetic gabbro sill, carrying both Flood Zone-style mineralisation and polymetallic sulphide veins with elevated gold values. The Nutaaq (Gnu) Zone mineral resource sits within approximately a 200-metre section of this sill, less than one kilometre from the Flood Zone gold deposit. The 2026 Phase 2 targets were developed from 2025 field work integrating LOUPE-EM anomalies, mapped alteration zones, and quartz vein frost heave samples, broadening the Nutaaq exploration model considerably.
Grays Bay Road and Port Project Advances Alongside Exploration Activity
Blue Star noted that on June 24, 2026, the Government of Canada initiated consultations to consider listing the Grays Bay Road and Port Project under Schedule 1 of the Building Canada Act, following a March 12, 2026, referral to the Major Projects Office. The company states its projects are located 40 to 100 kilometres south of the proposed deep-water port, with the planned all-weather road corridor passing very close to its properties. Investors may be watching whether infrastructure progress influences the strategic value of Blue Star's Nunavut land package.


Please wait processing your request...